After-sales Service: | Machine Is Maintained Free of Charge |
---|---|
Warranty: | 18 Months |
Döşeme Türü: | Renkli Çelik |
Sertifika: | CE |
Koşulunu: | Yeni |
Özelleştirilmiş: | Özelleştirilmiş |
Doğrulanmış işletme lisanslarına sahip tedarikçiler
Uncoiling --- Feeding --- Roll Forming --- PLC Controlling --- Hydraulic Pressing --- Length to Cutting --- Receiving
Name | Rolling Shutter Door Roll Forming Machine | |
Raw Material | Material | PPGI PPGL GI GL |
Width | 1000/1200/1250mm | |
Thickness | 0.8-1.2mm, customized | |
Power Required | Power | 380V 3Phase 50Hz, customized |
Main Motor | 5.5KW, servo motor driving | |
Cutting Motor | 4.0KW | |
Roll Forming Machine | Support Frame | Square pipe welded |
Forming Station | 12 | |
Structure | Stong and stable | |
Shaft | 45# high grade steel, CNC finish milling | |
Roller | Cr12 | |
Transimission | 1.2inch Chain | |
Bearing | Standard | |
Speed | 12-18m/min | |
Cutting Blade | Cr12Mov, quenched 58°-62° | |
Operation | Touch button | |
Dimension | 6.5*1.0*1.5M | |
Weight | 4.5T |
Q1.What are the main key points for selecting right machines?
A1: Whole structure,Roller Shaft,Roller Material,Motor&Pump,and Control system. As the new buyer, please kindly know that price not the final point.
Good quality is for long-term business cooperation.
Q2. Can you provide OEM service for roll forming machine?
A2: Yes, most of cold roll forming machine need to be customized as detailed request, because raw material , size , production usage, machine speed, then machine specification will be some different.
Q3. What's your standard trade terms ?
A2: We can provide the technical offer with FOB,CFR,CIF,Door to Door and so on. Please kindly tell the detailed port name for competitive ocean freight.
Q4. How about the quality control?
A4: Our company adopts quality office to control every part with passed CE,TUV/BV Certificate.
Q5. How about the after-sale service?
A5: We provide 18 months free warranty and free technical support for the whole life of any machine. During warranty period, if parts still broken, we can send the new ones freely.
Q6. If I am in Beijing,Shanghai or Guangzhou,how to visit your company?
A6: 1) Beiing South Statioin to Cangzhou West Station (by fast train 1 hour).
2) Shanghai Hongqiao to Cangzhou West (4.5 hours)
3) Guangzhou Airport to Tianjin ,then Tianjin to Cangzhou West
Doğrulanmış işletme lisanslarına sahip tedarikçiler