• 6000~8000bph Pure Water Filling Machine / Bottled Mineral Water Production Factory
  • 6000~8000bph Pure Water Filling Machine / Bottled Mineral Water Production Factory
  • 6000~8000bph Pure Water Filling Machine / Bottled Mineral Water Production Factory
  • 6000~8000bph Pure Water Filling Machine / Bottled Mineral Water Production Factory
  • 6000~8000bph Pure Water Filling Machine / Bottled Mineral Water Production Factory
  • 6000~8000bph Pure Water Filling Machine / Bottled Mineral Water Production Factory

6000~8000bph Pure Water Filling Machine / Bottled Mineral Water Production Factory

Type: Gravity
Automatic Grade: Automatic
Material Type: Liquid
Filling Valve Head: Multi-Head
Feed Cylinder Structure: Multi-Room Feeding
Dosing Device: Surface Type

Tedarikçi ile İletişime Geçin

Elmas Üye Fiyat 2014

Doğrulanmış işletme lisanslarına sahip tedarikçiler

Üretici/Fabrika, Ticari Şirket

Temel bilgiler.

Hayır. Modeli.
CGF16-16-5
Filling Principle
Atmospheric Pressure
Packaging Container Lifting Structure
Chute Lifting
Structure
Rotary
Packaging
Bottle
Packaging Material
Plastic
i̇çecek türü
su
kapasite
3000 ~ 5000 bit
şişe tipi
evcil hayvan/cam
şişe boyutu
250 ~ 2000 ml
şişe çapı
50 ~ 110 mm
şişe yüksekliği
160 ~ 320 mm
sertifika
Ce, ISO9001-2015
kontrol
plc (erkekler/mistsubishi)
motor
erkek
Taşıma Paketi
Wooden Case
Teknik Özelikler
2850× 2150× 2700mm
Ticari Marka
Sky Machine
Menşei
Jiangsu Province
HS Kodu
8422301090
Üretim Kapasitesi
50sets/Year

Ürün Açıklaması


6000~8000bph Aqua Water Filling Machine

Flow Chart of Water Filling Production Line

6000~8000bph Pure Water Filling Machine / Bottled Mineral Water Production Factory



Main components:
1) driving system;
2) bottle-loading system;
3) bottle-rinsing system;
4) handing-over system between rinsing and filling;
5) filling system;
6) handing-over system between filling and capping;
7) capping system;
8) cap-unscrambling system;
9) bottle-unloading system;
10) frame;
11) electrical system.


Main features

1,Rinser
6000~8000bph Pure Water Filling Machine / Bottled Mineral Water Production Factory
 
  1. The rotary wheel is a fully stainless steel welded structure.
  2. The machine applies unique overturning bottle clamp, which is an innovation of our company. This bottle clamp grips bottle at neck position, avoiding bottle mouth thread contamination caused by rubber gripper block of a traditional bottle clamp. Made of SUS304 stainless steel, this bottle clamp is hygienic and durable.
  3. The high efficiency atomizing spay nozzle installed on bottle clamp is capable of cleaning any part of bottle inner wall, and also saves rinsing water.
  4. All sliding bushes of lifting device use Igus (Germany) anti-corrosion maintenance free bearing.
  5. The rinser is driven by driving system positioned inside machine frame via gear transmission.
  6. Transfer starwheel
  7. Made of stainless steel of superior quality.
  8. Equipped with bottle jam protection device. 
2,Filler

6000~8000bph Pure Water Filling Machine / Bottled Mineral Water Production Factory
 
  1. Rotary wheel fully made of stainless steel SUS 304.
  2. Gravity filling method.
  3. Filling valves are made of SUS316L.
  4. Filling valves are reasonably structured with accurate filling.
  5. Bottles go up and down in the function of cam through elevator, to process filling with contact to bottle-mouth.
  6. Level of cylinder is controlled with float-ball.
  7. Filler is driven through gears inside the machine frame.
  8. Link-wheels in rinser, filler and capper are transported in ringed support of bottle-neck.

3,Capper
6000~8000bph Pure Water Filling Machine / Bottled Mineral Water Production Factory

Capper is the machine with highest precision, influence very much with the stability and reliability of the filling monoblock. Our capper features as follows:
The equipment is designed and used the technology of  Arol from Italy, most advance technology in the world, developed with the experience of asepsis filling machine. For example, I) extruding wheel (main part to control the stability when sealing), uses the technology of Arol. Kinematical and kinetic design of the wheel by experts improves the stability and credibility of the equipment. II) Sealing faucet (main part to control the credibility of sealing), is improved by experts with the design of alnico. Besides the magnetic contortion variation device, there is variation dial which makes variation more easily. The benefit of this design is not only it can set the contortion, but also it makes contortion more precise and credible, and reduces inferior.
Cap distributing chute is equipped with reverse cap stop and reverse cap pick-out mechanism.
Cap distributing chute is equipped with a photocell switch to stop the capper when there is no cap inside the chute.
The capper is equipped with inlet bottle detection switch.
Centrifugal way of cap arranging is adopted to reduce damage of caps.
A cap inspecting system is applied to control on-off of elevator.

Machine List of Water Bottling Machine/Production Line
Model CGF14125 CGF16165 CGF24248 CGF323210 CGF404010 CGF505012 CGF606015
Production
 capacity
(bottle/hour)
3000-5000 6000-8000 8000-12000 12000-15000 16000-20000 20000-24000 25000-30000
Suitable bottle diameter(mm) φ=50-100 H=170-330
Motor power 1.5kw 2.2kw 3kw 4kw 7.5kw 9.5kw 12kw
Power of
outer
vacuum
pump
0.75 1.1 1.5 2.2 2.2 3 4
overall dimension
(LxWxH)
  
2100x
1400x
2500
2460x
1720x
2650
3100x
2100x
2650
3500x
2500x
2650
4600x
1800x
2650
5200x
4500x
3400
6500x
4500x
3400
Weight   2500 3500 4200 5500 6800 7600 9800

Company Introduction
6000~8000bph Pure Water Filling Machine / Bottled Mineral Water Production Factory

Company Certificate
6000~8000bph Pure Water Filling Machine / Bottled Mineral Water Production Factory

FAQ:

Q1:What's your guarantee or the warranty of the quality if we buy your machines?
A1:We offer you high quality machines with 1 year guarantee . we will give u spare part free in 1 year,
Life long after service. Mean while, our engineers go more than 50 countries for debugging, with rich experience.
 
Q2:When can I get my machine after I paid?
A3:We will deliver the machines on time as the date we agreed both side.
 
Q3:How can I install my machine when it arrives?
A3:We will send our engineer to your side as soon as you get all your machines ready , for testing
and teaching your technicians how to run the machines. 
 
Q4:What's the delivery time?
A4:30-45 days after the T/T deposit or L/C.
 
Q5:What's min order quantity?
A5:1 unit

Sorgunuzu doğrudan bu sağlayıcıya gönderin

*İtibaren:
*Şuradan:
*Mesaj:

Lütfen 20 ila 4000 karakter arasında girin.

Aradığınız şey bu değil? Satın Alma talebini Şimdi Yayınla