• ASME Code Gas to Gas Combined Air Preheater Used for Denitration SCR System
  • ASME Code Gas to Gas Combined Air Preheater Used for Denitration SCR System
  • ASME Code Gas to Gas Combined Air Preheater Used for Denitration SCR System
  • ASME Code Gas to Gas Combined Air Preheater Used for Denitration SCR System
  • ASME Code Gas to Gas Combined Air Preheater Used for Denitration SCR System
  • ASME Code Gas to Gas Combined Air Preheater Used for Denitration SCR System

ASME Code Gas to Gas Combined Air Preheater Used for Denitration SCR System

Tip: Paslanmaz Çelik Isıtma Ekipmanı
Sertifika: ISO, asme u api
Yapı: Dikey Tip
teslimat süresi: ekipmanın miktarına bağlı olarak
garanti süresi: bir yıl
uygulama: petrol rafinerisi, petrol, kimyasal sanayi

İletişim Tedarikçi

Elmas Üye Fiyat 2015

Doğrulanmış işletme lisanslarına sahip tedarikçiler

Üretici/Fabrika

Temel bilgiler.

marka adı
şarap teknikleri
menşei
shandong, çin
Taşıma Paketi
Wooden Case
Teknik Özelikler
depending on customer′s request
Ticari Marka
şarap teknikleri
Menşei
shandong, çin
Üretim Kapasitesi
500sets/Year

Ürün Açıklaması

Air preheater

Air preheater is a heating device that is designed to recover waste/exhaust heat from hot flue gas to preheat the air for next process, usually as combustion air to burn in furnace. So it is usually named the waste-to-energy equipment.



PRODUCT SPEIFICATION

Product Name Air Preheater
Heating Core PlateType or Tube Type or Combined
Plate Material SS304/SS316/Ti/Customized
Certification ISO/ASME
Leading Time 90 Days
Application Field Petroleum/Chemical Industry etc. for example:Oil Refinery

PRODUCT DISPLAY


ASME Code Gas to Gas Combined Air Preheater Used for Denitration SCR System
Advantage:

Advantages of Stainless Steel Plates Type
• 0.8~1.5 mm metallic plate as the heat transfer element, high heat transfer efficiency;
• RSEW+ GTAW to create the heat transfer bundles, zero leakage;
• Plates are vertically placed, dust(dirt) flows with flue gas from top to bottom, not easy to
accumulate dust or cause block.
• Corrugated dimple plate, providing steady support and prevent deformation;
• Compact structre, saving cost of foundation, frames and installation work;
• Modular design, more flexible for transportation and site installation.


ASME Code Gas to Gas Combined Air Preheater Used for Denitration SCR System

Advantages of Silicon Carbide Materials
• It has extremely high corrosion resistance, oxidation resistance and erosion resistance, and can resist high concentration of sulfuric acid, nitric acid, phosphoric acid, mixed acid, strong base, oxidant, etc.
• The thermal conductivity is much higher than that of other non-metallic corrosion resistant materials, and less heat transfer area is used under the same heat transfer efficiency.





ASME Code Gas to Gas Combined Air Preheater Used for Denitration SCR System




COMPANY PROFILE
ASME Code Gas to Gas Combined Air Preheater Used for Denitration SCR System
TECHNICAL TEAM

ASME Code Gas to Gas Combined Air Preheater Used for Denitration SCR System


PRODUCT DISPLAY
ASME Code Gas to Gas Combined Air Preheater Used for Denitration SCR System

Pre-sales Service:
Customization:
We can specially customize products if you tell us any special requests,such as spare parts, cylindrical tank, material, output, pump...
 
After-sales Service:
1. One-year free warranty and life-long maintenance service
2. Equipment operation and maintenance vedio guide for the customers
3. Help to do worker training
4. On-line support every day
 
 PACKAGING & DELIVERING

ASME Code Gas to Gas Combined Air Preheater Used for Denitration SCR System

FAQ:
 
1.Q:Are you a factory or trading company? 
  A:We are one of the largest heating furnaces manufactory in China
 
2.Q:Can we visit your factory before placing orders?
  A:Sure,warmly welcome to our factory!

3.Q:What's the info needed if I send one inquiry?
  A:Pls tell us the working conditions,mediums,temperature,pressure,  equipment's material,size,quantity,and other special requests

4.Q:What is the MOQ?
  A:We accept loose quantity order,any trial orders or mixed order

5.Q:How does your factory do quality control? 
  A:Quality is priority,we make relevant strict testing before delivery
    Our factory has already obtained ISO9001 quality and ISO 14001   
    Environmental management system certificate

Sorgunuzu doğrudan bu sağlayıcıya gönderin

*İtibaren:
*Şuradan:
*Mesaj:

Lütfen 20 ila 4000 karakter arasında girin.

Aradığınız şey bu değil? Satın Alma talebini Şimdi Yayınla

Kategoriye Göre Benzer Ürünleri Bulun

Tedarikçi Ana Sayfası Ürünler Isıtma fırınları ASME Code Gas to Gas Combined Air Preheater Used for Denitration SCR System

Bunları Da Beğenebilirsiniz

İletişim Tedarikçi

Elmas Üye Fiyat 2015

Doğrulanmış işletme lisanslarına sahip tedarikçiler

Üretici/Fabrika
Yönetim Sistemi Sertifikasyonu
ISO 9001, ISO 9000, ISO 14001, ISO 14000, OHSAS/ OHSMS 18001, HSE
Ödeme Koşulları
AKREDITIF, T/T