Temel bilgiler.
Structural Style
Multi-Pole Scaffolding
Framework
Frame Combined Scaffolding
Supporting Mode
Floor Type Scaffolding
Lapping Form
Full Scaffolding
Erection Position
External Scaffolding
Move Method
Horizontal mobile Scaffolding
Scaffolding Part Type
Scaffolding Planks
Construction Properties
Building Scaffold
Taşıma Paketi
by Container
Teknik Özelikler
1.1/1.2/1.3/1.4/1.5mm thickness
Ürün Açıklaması
210mm*45mm*3m/4m steel scaffolding board/plank
Scaffolding plank | Scaffolding plank |
210 x 45 x 1.2 x 4000 | 13.6 | 500 x 50 x 1.2 x 1829 | 15.5 |
210 x 45 x 1.2 x 3000 | 10.26 | 480 x 45 x 1.2 x 1829 | 13.5 |
210 x 45 x 1.2 x 2000 | 6.93 | 450 x 45 x 1.2 x 1829 | 13 |
210 x 45 x 1.2 x 1000 | 3.59 | 450 x 38 x 1.2 x 1829 | 12.5 |
240 x 45 x 1.2 x 4000 | 14.87 | 420 x 45 x 1.2 x 1829 | 12.5 |
240 x 45 x 1.2 x 3000 | 11.23 | 500 x 50 x 1.2 x 1219 | 11 |
240 x 45 x 1.2 x 2000 | 7.59 | 480 x 45 x 1.2 x 1219 | 10 |
240 x 45 x 1.2 x 1000 | 3.94 | 450 x 45 x 1.2 x 1219 | 9.5 |
250 x 50 x 1.2 x 4000 | 15.67 | 450 x 38 x 1.2 x 1219 | 9 |
250 x 50 x 1.2 x 3000 | 11.84 | 420 x 45 x 1.2 x 1219 | 9 |
250 x 50 x 1.2 x 2000 | 8 | 330 x 50 x 1.2 x 1829 | 11.5 |
250 x 50 x 1.2 x 1000 | 4.15 | 330 x 50 x 1.2 x 1219 | 8.5 |
FAQ
1. Question: What's your MOQ(minimum order quantity)?
Answer: One full container.
2. Question: What's your packing methods?
Answer: Packed into bundle, and rest in bulk.
3. Question: What's your payment terms?
Answer: T/T 30% in advance & T/T 70% upon sending the copy of Bill of Lading, L/ C 100%, or negotiate according
to the order status
4. Question: What's your delivery time?
Answer: 10-20 days after received the advance payment or L/C.
5. Question: Are you manufacturer or trader?
Answer: We are the munafacturer of SCAFFOLDINGS MATERIALS for decade years. Our group company has 8
subsidiaries and 4 factories, coveraged every scaffolding systems.
6. Question: Where's your factory?
Answer: Our factory is in Tianjin city (near Beijing) and Jiayu city, Hubei Province, afforded enough production ability
and earlier delivery time.
7. Question: Can we visit your factory?
Answer: Warmly welcome. Once we have your schedule, we will arrange the professional sales team to follow up your
case.
8. Question: Can you supply other scaffolding materials?
Answer: Yes. All related scaffolding materials.
(1) scaffolding system (cup-lock system, ring lock system, frame, pipe&coupler system)
(2) scaffolding pipes (1.5'-2.0')x(0.3-12m), hop dipped galvanized/ black. BS1139, STK500
(3) steel pipes (ERW BS1387, SSAW PIPE, Sqaure/ Rectangular tube GB/T6728)
(4) steel coupler (preesed / drop forged coupler)
(5) steel plank with hooks or without hooks
(6) steel stair case
Adres:
No. 30, Xintang Road, Xintang Town, Zengcheng District, Guangzhou, Guangdong, China
İşletme Türü:
Ticari Şirket
İşletme Aralığı:
İnşaat ve Dekorasyon
Şirket Tanıtımı:
Şirketimiz, çok amaçlı taleplerinizi karşılayabilecek çeşitli ürünler sunar.
Şirketin kurulmasından bu yana "önce kalite, önce müşteri ve kredi tabanlı" yönetim ilkelerine bağlı kalırız ve müşterilerimizin potansiyel ihtiyaçlarını karşılamak için her zaman elimizden geleni yaparız.
Ekonomik küreselleşme trendi karşı konulamaz bir güçle geliştiğinden, kazançlı bir durum elde etmek için şirketimiz dünyanın dört bir yanından gelen kuruluşlarla işbirliği yapmaya samimi bir şekilde istekli.