After-sales Service: | 1 Year |
---|---|
Warranty: | 1 Year |
Product Line: | Bag Making Machine |
Lines: | 6 |
Voltage: | 220V |
Seals Mode: | Trilateral Seals |
Doğrulanmış işletme lisanslarına sahip tedarikçiler
Schematic Diagram
Production Flow
Parameter Name | DC-330F | DC-450F | DC-450BF |
Cutting Length | 270-530mm | 270-530mm | 380-760mm |
Cutting Length(Handle) | 270-430mm | 270-430mm | 380-660mm |
Bag Width | 120-330mm | 210-450mm | 210-450mm |
Bag Width(Handle) | 200-330mm | 240-450mm | 240-450mm |
Bottom Width | 60-180mm | 90-180mm | 100-220mm |
paper | 60-150g/m^2 | 80-150g/m^2 | 80-150g/m^2 |
Paer (Handle) | 80-150g/m^2 | 80-150g/m^2 | 80-150g/m^2 |
Paer Roll Width | 380-1050mm | 590-1290mm | 620-1370mm |
Paer Roll Width(Handle) | 620-1050mm | 690-1290mm | 710-1370mm |
Paer Core | Φ76mm | Φ76mm | Φ76mm |
Roll Paer Diameter | Φ1200mm | Φ1200mm | Φ1200mm |
Flat Rope Making Machine Requirements | |||
Flat Rope Distance | 78mm | 85mm | 85mm |
Flat Rope Width | 12mm | 12mm | 12mm |
Flat Rope Height | 100mm | 100mm | 100mm |
Patch Width | 50mm | 50mm | 50mm |
Patch Length | 152mm | 190mm | 190mm |
Flat Rope Length | 352mm | 352mm | 352mm |
Patch Feeding Width | 100mm | 100mm | 100mm |
Material Thickness | 120g/m^2 | 120g/m^2 | 120g/m^2 |
Handle Roll Diameter | 1200mm | 1200mm | 1200mm |
Paper Bag Width Flat Rope Speed | 30-110pcs/min | 30-90pcs/min | 30-90pcs/min |
Production Speed | 30-180pcs/min | 30-150pcs/min | 30-100pcs/min |
Machine Speed | 30-200pcs/min | 30-180pcs/min | 30-150pcs/min |
Cutting Type | Sawtooth Cuting | Sawtooth Cuting | Sawtooth Cuting |
Power | 380V 3phase 4line 41.5kw | 380V 3phase 4line 41.5kw | 380V 3phase 4line 42.5kw |
Machine Weight | 16000kg | 16000kg | 16600kg |
Machine Size | 14000x6000x2400mm | 14000x6000x2400mm | 16100x6500x2400mm |
Q1. How to install and operate the machine?
Due to the Global Epidemics we can not send the engineer , will provide the manual and installation video.
After the global epidemic end, The seller will send 1 engineer to install, test the production line and train customers' workers in buyers' factory. It will take 1 week for whole installation and training.
Q2. What should we charge for your engineer?
The buyer should cover engineers' salary, visa cost, round-trip air tickets, accommodations, transportation in buyers' country, food, medical care, safety cost, and related cost happens in buyers' country. Also, the buyer should prepare enough labor, electric wire outside the control panel and tools for installations.
Engineer's salary is USD 80/day, depending on how the engineer make you satisfied. The date he arrives and leaves shall be counted as paid day.
Q3. How long is your machine's warranty period?
Warranty period for the delivered equipment will be 12 months after completion of erection but not later than 18months after shipment. In case any item proves to be defective and the damage is confirmed by seller's technicians within this period, the seller will at their choice either send engineer to repair or supply a new one for replacement free of charge on the basis of CNF delivery.
The above item does not include the parts, which have regular spares or the parts damaged from normal wear, abnormal operation, improper maintenance and inadequate civil works. The seller is not liable for any production loss under any circumstances.
Q4. How do we solve the machine problem after your engineer leaving?
Generally speaking, there will be no problem after finish installing. In case you have any problem. You can contact our after sales specialist at any time. Engineers will help to take a solution video according your description.
Q5. How do you arrange packing for machine?
As per export standard, they will also be treated before delivery against damage and rusting.
Doğrulanmış işletme lisanslarına sahip tedarikçiler